Fig. 4

Residual load duration curves (RLDC) for the TransnetBW grid network with flexible and non-flexible bioenergy (2022 installed capacities, 2-year reference period)
Residual load duration curves (RLDC) for the TransnetBW grid network with flexible and non-flexible bioenergy (2022 installed capacities, 2-year reference period)