Fig. 8
From: Transformation pathways of phasing out coal-fired power plants in Germany

Expected changes in installed capacity, source: [105]. Remarks: *without renewables. The scenarios A2030, B2030, and C2030 differ with respect to the assumed speed of the transition process of the Germany energy system. A2030, moderate; B2030, accelerated; C2030, rapid implementation