Your privacy, your choice

We use essential cookies to make sure the site can function. We also use optional cookies for advertising, personalisation of content, usage analysis, and social media.

By accepting optional cookies, you consent to the processing of your personal data - including transfers to third parties. Some third parties are outside of the European Economic Area, with varying standards of data protection.

See our privacy policy for more information on the use of your personal data.

for further information and to change your choices.

Skip to main content

Table 2 Operational elements of the valorization units

From: Anaerobic digestion and integration at urban scale: feedback and comparative case study

Name

Process studied

Wastes

Collection

Storage

Pretreatment

In flow

Reactor

Condition

Biogas production

Digestate/lixivia

Biogas valorization

Bedzed

Living Machine1

Wastewater

By pipe directly from household; district area restricted

LEAP

AD in situ

Food waste

Transport by inhabitant; collection from local deposits (bike)

Pre-feed tank with grinder

2m3 reactor

Composting fertilizer

CHP unit

Les Grisettes (Montpellier)

AD in situ

Household waste and green waste

Collection truck; district area extended

Mechanical-biological treatment and heating

140,000 tons/year of household waste (organic + inorganic)

Based on the Valorga® process

Dry condition co-digestion

Annual production: 11800000 m3 of biogas estimated

Composting 33,000 t/year

CHP unit generate yearly 22 GWh as electricity and 12 GWh as heat. Used for local installation and dwellings

Brest

Compost in situ

Green waste and a fraction of organic waste from household

Transport

Freiburg im Breisgau

AD ex situ

Organic waste from household and local commercial establishments

Transport; urban area extended

Mechanical sorting and crushing: Addition of water

39,200 tons/year

Based on the Valorga® process

Thermophilic condition; Dry condition; Mono-digestion; 4000 m3

110–120 Nm3/t input digestion

Screw press; Fertilizer

12,600 tons/year and Composting 9500 tons/year

CHP plant; 11 600,000 kWh as electricity

Flintenbreite (Lübeck)

AD in situ

Wastewater and organic waste from household

Independent wastewater system and collection directly from household

Shredding storage tank and sanitation

1217 m3/year of blackwater; 3 tons/year kitchen waste

CSTR of 72 m3

Wet condition; mesophilic temperature; HRT: 21–24 days; co-digestion

4700 m3 CH4/year; 22,500 m3 CH4/year estimated for maximal conditions and additional co-digestion

Screw press; fertilizer and composting

CHP valorization unit

Jenfelder Au (Hamburg)

“Local” AD

Black water; greasy water; kitchen waste and lawn cutting

District area extended

Silage for lawn cutting

Macerator or press for lawn cutting

30m3/days

Semi- CSTR of 900m3

Wet condition; mesophilic condition; HRT: 25 days; co-digestion

Separation; fertilizer and composting; annual production estimated 1700–3500 t of compost and 50–120 t of fertilizer

CHP unit

Quartier Vauban (Freiburg)

AD in situ

Wastewater

From one building by pipe; district area restricted

CHP unit

Allermöhe (Hamburg)

Compost in situ

Wastewater and organic waste from household and green waste

Collected directly by inhabitants; transport

40 l/cap/year

Nashik

AD ex situ

Food waste (from local hotels) and blackwater

Community toilet complex and transport truck; city area restricted

Storage in septic tank

Shredding and sanitation process

30 tons/day

1300 m3

Wet condition; HRT: 35 days; co-digestion

2500 m3 of biogas/days

1.5–2 million tons/day as manure

CHP unit to produce 3300 kWh/day (estimation)

Noorderhoek (Sneek)

AD in situ

Blackwater, kitchen waste, and grey water (study)

Pipe directly from household; district area restricted

Flocculation for grey water; used of macerator for kitchen waste.

280–670 l/days

UASB of 2.5–7 m3

Wet condition, mesophilic temperature, HRT: 0.8–27 days; co-digestion; mono-digestion (study)

13.8–12.2 m3 CH4/cap/year

Struvite precipitation and nitrification/denitrification tank

CHP unit; 133–148 kWh/cap/year (heat)

Eva-Lanxmeer (Culemborg)

AD in situ; Living Machine1

Blackwater, food waste and green waste

Independent wastewater system; social program for collect and transport

Shredding and acidification tank

1073 m3/year

70 m3

Wet condition, mesophilic condition; HRT: 20 days; co-digestion

27,000 m3 biogas/year

Composting and fertilizer

CO2 extraction and CHP

Malmö

AD ex situ (Sjölunda)

Blackwater and a fraction of household and food waste

Specific collect truck and vacuum collection points; urban area extended

Storage tank (vacuum collection)

Sludge thickener

1350 l wastewater/second, only a fraction is used for AD

6 reactor of 16,000 m3

Wet condition; mesophilic temperature HRT: 40 days (wastewater); co-digestion

Capacity of the gas upgrading plant: 550 Nm3/h

Dewatering and fertilizer

80% of the biogas produced is converted into fuel

Bo01/Fullriggaren (Malmö)

AD ex situ (Kristianstad)

Food waste (co-digestion with manure)

Vacuum system; sink shredders; urban area extended

Separated tank

Mechanical sorting; shredding; extruding; sanitation

62,500 tons/year (5500 tons of food waste)

CSTR of 2 × 5000 m3

Wet condition; mesophilic temperature; HRT: 22 days; co-digestion

Fertilizer; 63,000 tons/year of liquid bio manure

Upgrading as biofuel capacity of 200 Nm3/h; 40,000 MWh/year; heating: 65% fuel: 35%

AD ex situ (Sjölunda)

Wastewater (+ fraction of food waste greasy waste)

Pipe directly from household; urban area extended

WWTP pretreatment; sludge thickener

1350 l wastewater/second

6 × 1 6000 m3

Wet condition; mesophilic temperature; HRT: 40 days; co-digestion

Fertilizer

Upgrading as biofuel capacity of 550 Nm3/h

Hammarby Sjöstad (Stockholm)

AD in situ (Henriksdal)

Wastewater (+ fraction of food waste greasy waste)

Pipe directly from household; urban area extended

Chemically precipitated

54,000 tons/year (based on dry sludge)

CSTR; 7 reactors for a total of 39,000 m3

Wet condition; mesophilic condition (thermophilic forthcoming); HRT: 19 days

Dewatering and fertilizer; 56,500 tons/ year of de-watering sludge

Upgrading as biofuel; 58,000 MWh (maximum) upgraded from Henriksdal WWTP, majorly in fuel and a small fraction is upgrading in household gas for the district

AD ex situ (Södertörn)

Food waste

Vacuum collection points and transport trucks

Storage tank (vacuum collection); urban area extended

Mechanical thickener; sanitation process

50,000 tons/year (extended soon to 260,000 tons/year)

2 reactors of 4500 m3

Increased to 20 million Nm3 of upgraded biogas

Centrifugation and evaporation plant; 14,000 tons of bio-fertilizer yearly

Upgrading as biofuel; 80 GWh biogas (which will increase to 200 GWh).